Back to top

Analyst Blog

This page is temporarily not available.  Please check later as it should be available shortly. If you have any questions, please email customer support at support@zacks.com or call 800-767-3771 ext.  9339.

The commercial aerospace behemoth The Boeing Company (BA - Analyst Report) finally received the green light from the U.S. Federal Aviation Administration (FAA) for the 787 Dreamliner’s redesigned battery. This marks an important step toward getting the grounded jetliner back in the skies.

Following a broad review of certification tests, Boeing’s new improved 787 battery system was approved by the FAA. The approval enables Boeing to install lithium ion batteries on 787 jets that include added protection around the cells to control overheating, a steel case to prevent any fire from diffusion as well as a tube that vents fumes outside the aircraft.

The company has already initiated the modification work and FAA will likely issue a directive soon, lifting the three-month ban once the fixing is complete. Boeing’s teams around the world are prepared to install the new lithium-ion battery systems and the operation will take around five days once it starts. The FAA’s approval is only applicable to U.S. airlines. However, other international regulators also follow the agency’s direction.

All Nippon Airways (“ANA”) − Boeing’s largest 787 customer − has started installing the batteries into 5 of its 17 Dreamliner planes and intends to carry 100 to 200 test flights in May with this latest battery system before taking passengers again. After ANA, the biggest 787 operator, Japan Airlines Co., also began replacement procedures. Japan Airlines and ANA, the two big airlines in Japan, still need approval from Japanese regulators before the re-commencement of their flights.

The only U.S. operator of the 787, United Continental Holdings Inc. (UAL - Analyst Report), plans to continue service between Houston and Denver by May 31, and commence Dreamliner service between Denver and Tokyo by Jun 10.

Two battery overheating incidents in Jan 2013 compelled all 50 Boeing 787 airplanes to be grounded. The 787 Dreamliner is the first passenger jetliner manufactured mostly of lightweight and environmentally friendly composite material.

The grounding of the 787 Dreamliner has cost Boeing an estimated $600 million. Despite the interruption in deliveries that started in January, Boeing aims to finish all planned 2013 deliveries by the end of the year. Further, the company expects no adverse impact on its assumptions for the year from the 787 battery issue.

Boeing currently retains a Zacks Rank #3 (Hold). Other stocks in the sector are Wesco Aircraft Holdings, Inc. (WAIR - Snapshot Report) and Triumph Group, Inc. (TGI - Analyst Report), both with a Zacks Rank #2 (Buy).

Please login to Zacks.com or register to post a comment.

New to Zacks?

Start Here

Zacks Investment Research

Close

Are you a new Zacks Member or a visitor to Zacks.com?

Top Zacks Features

Learn more

Start for as little as $4.50 per trade.

My Portfolio Tracker

Is it Time to Sell?

One of the most important steps you can take today is to set up your portfolio tracker on Zacks.com. Once you do, you'll be notified of major events affecting your stocks and/or funds with daily email alerts.

More Zacks Resources

Zacks Rank Home - Evaluate your stocks and use the Zacks Rank to eliminate the losers and keep the winners.

Mutual Fund Rank Home - Evaluate your funds with the Mutual Fund Rank for both your personal and retirement funds.

Stock/Mutual Fund Screening - Find better stocks and mutual funds. The ones most likely to beat the market and provide a positive return.

My Portfolio - Track your Portfolio and find out where your stocks/mutual funds stack up with the Zacks Rank.

Zacks #1 Rank Top Movers for Zacks #1 Rank Top Movers

Company Symbol Price %Chg
DIXIE GROUP DXYN 15.84 +7.90%
BOFL HOLDING BOFI 85.30 +4.97%
RAMBUS INC RMBS 12.31 +4.41%
VIPSHOP HOLD VIPS 148.73 +4.35%
NETFLIX INC NFLX 345.74 +4.32%